Wednesday, August 4, 2010

ORDINANCE 10-150
AN ORDINANCE OF THE CITY OF LAKELAND AMENDING THE FEE SCHEDULE BEGINNING FISCAL YEAR 2010/2011

Be It Ordained By the City of Lakeland as follows:

SECTION 1: The City of Lakeland Fee Schedule is hereby amended as attached hereto (Exhibit A)

First Reading: May 06, 2010.
Public Hearing: May 25, 2010.
Final Reading: June 03, 2010.




Scott Carmichael, Mayor

ATTEST:




Sontidra L. Thomas, CMC
City Recorder



EXHIBIT A



CITY OF LAKELAND FEE SCHEDULE




TABLE OF CONTENTS

CITY OF LAKELAND USER FEES 1
Parks and Recreation Fees 1
Other Fees
Solid Waste Fee 2
Sewer Fees 2
Residential 2
Commercial 2
Stormwater User Fees --------------- 2
Basketball Goal Storage & Removal Fee ------- 2

CITY OF LAKELAND FEE SCHEDULE 3
Copies 3
Research 3
Manuals 3
Maps 3
Custom Maps 3
Digital Data 3
Cell Tower Fee 3

PERMITS 4
Building Permits 4
Residential 4
Commercial 4
Accessory Permits 5
Sign Permits 5
Land Disturbance Permits 5
Residential 5
Non Residential 5
Road Cut Permits 6
Tree Removal Permit 6
Tree Disturbance Permit 6

SUBMISSION FEES 6
Design Review Commission 6
Zoning Map Amendment Application 6
Board of Zoning Appeals 6
Residential 6
Non-Residential 6
Municipal Planning Commission 7
Non-Residential 7
Preliminary Site Plan 7
Final Site Plan 7
Residential 7
Planned Developments 7
Advertising Fee 7
Re-notification 7
Re-recording 7

DEVELOPMENT FEES 7
Inspection Fee 7
Administrative Review Fee 7
Geographical Information System Fee 7
Warning Siren Fee 7
Road Improvements Fee 8
Engineering Review Fee 8
Natural Resources Inventory and Analysis Fee 8
Tree Removal 8
Drainage Control Fees 8
Parkland Review/Development Fees 8
Review Fee 8
Residential Development Fee 8
Parkland Improvement Fee 8
Street Lights Fee 8
Sewer Development Fees 8
Sewer Lift Station Maintenance Fee 8



CITY OF LAKELAND USER FEES

Parks and Recreation Fees:

Team Fees: Soccer $90.00 (Ord.10-150)
Basketball $90.00 (Ord. 10-150)
Cheerleading (uniform not included) $85.00 (Ord. 10-150)
T-Ball -------------------------------------- $90.00 (Ord. 10-150)
Tennis Lessons ------------------------------ $25 (per session)
Tennis League Play ---------------------------------- $25

Camp Fee: Day Camp Fee (per week) -------------------$75 (1st child)
$50 (per week) for each additional child (same family)
(Full Enrollment – Monday through Friday, 8:30 am – 3:30 pm)
Day Camp Fee (week to week) $100 (per child)

Pavilion: Rental $100.00 (Ord. 10-150)
Clean-up deposit (refundable) $50.00 (Ord. 10-150)

IH Clubhouse: Rental (first four hours) $500 (Ord. 10-150)
$50 (for each additional hour)

Cancellation Fee -------------------------------------- $50 (3 wks. prior)
Cancellation of Reservation Deposit ------------- $200
(less than 3 wks. of the event)

Training/Instructional/Educational Classes:
Rental (1½ daytime hours) ------------------------------ $12.50
(plus negotiated fee based on number of students)
Note: A minimum number of rental periods (i.e. once per week
for eight weeks) may be required for this rate.

Rental (first three daytime hours) ---------------------- $25
(plus 25% of the class fee revenue (minimum charge of $2.50 per person.) (Ordinance 10-143)
Note: Night classes are available Monday through Thursday with approval of City Manager or Designee.












CITY OF LAKELAND MISCELLANEOUS FEES


Other Fees: (City of Lakeland residents pay, but are not collected by the City)

Solid Waste Fee: Per Resident $21.78 per month

Yard Waste Collection Fee: Each Pick-up $25 (1st 30 mins.)
$10 (per 5 mins.)
(Ordinance 09-139)

Ambulance Fee: Per Resident ------------------------------------- $3.20 (per month)
(Paid through Utility Bill)
Sewer Fees:
Residential $0.90 per CCF after 8.02 CCF plus $12.00 minimum charge
$12.00 MINIMUM CHARGE UP TO 8.02 CCF
MAXIMUM MONTHLY SEWER USE CHARGE IS $30.00
PLUS $10.00 MONTHLY SEWER SURCHARGE
(Ordinance 10-147)

For Calendar Year 2012, the Sewer Rate shall be $1.12 per CCF after 8.02 CCF plus a $12.00 minimum charge
The $12.00 minimum base rate charge shall be applied to the first 8.02 CCF (Ordinance 10-147)

Commercial $1.10 per CCF, $45.00 minimum up to $1000.00
MAXIMUM PLUS $10.00 MONTHLY SURCHARGE
(Ordinance 10-147)

For Calendar Year 2012, the Sewer Rate shall be $1.21 per CCF,
$45 minimum up to $1,000 maximum plus a $10 monthly surcharge. (Ordinance 10-147)

Stormwater User Fees ------------------------------ $3.20/ERU/month
(Ordinance 08-128)

Basketball Goal Storage & Removal Fee

Picking up basketball goal ---------------------------- $75.00 (Ord.10-150)
Storage Fee (for storing basketball goal) --------- $50.00 (Ord.10-150)
Picking up (concreted in) basketball goal --------- $100.00 (Ord.10-150)



CITY OF LAKELAND FEE SCHEDULE

Copies:
Per Page - Black & White $0.15 (Ord 09-129; Res 2009/07-42)
Per Page – Colored $0.50 (Ord 09-129; Res 2009/07-42)
Oversized copies per page At Actual Cost to City
(Ord 09-129; Res 2009/07-42)

Research:
0-59 Minutes No Charge
(Ord 09-129 & Res 2009/07-42)
60+ Minutes Cost of Employee per Hour
(Ord 09-129 & Res 2009/07-42)
Manuals:
Charter $ 5.00
Municipal Code $75.00
Zoning Ordinance $50.00
Subdivision Regulations $50.00
Comprehensive Plan $50.00
Zoning Ordinance, Subdivision Regs & Comprehensive Plan (CD) $10.00
Erosion & Sediment Control Handbook $30.00
Design Review Commission Manual $30.00
S.O.B Ordinance $10.00
Tree Ordinance $10.00
Sign Ordinance $10.00
Fence Ordinance $10.00
Mobile Home Park Ordinance $10.00
Substandard Property Removal $ 3.00
Boards & Commissions By-laws $ 5.00



Maps Actual Cost to City
(Ord. 09-129 & Res 2009/07-42)


Custom Maps:
8.5” x 11” $15.00 (minimum)
11” x 17” $25.00 (minimum)
24” x 36” $75.00 (minimum)
36” x 50” $100.00 (minimum)


Digital Data At actual cost to City
(Ord. 09-129 & Res 2009/07-42)


Cell Tower Fee:
Connection Privilege $2,000.00 per user



CITY OF LAKELAND FEE SCHEDULE

PERMITS
* Double Permit Fee for Construction Begun Prior to Permit Issued
* $50 Re-inspection Fee for all Failed Inspections

BUILDING PERMITS:
Residential:
New homes and additions:

900,000 and over ------------------------ $1,250.00
800,000 to 899,999 -------------------- $1,150.00
700,000 to 799,999 -------------------- $1,050.00
600,000 to 699,999 -----------------------$950.00
500,000 to 599,999 -----------------------$850.00
400,000 to 499,999 -----------------------$750.00
350,000 to 399,999 ---------------------- $700.00
300,000 to 349,999 -----------------------$650.00
250,000 to 299,999 -----------------------$600.00
200,000 to 249,999 -----------------------$550.00
150,000 to 199,999 -----------------------$500.00
100,000 to 149,999 -----------------------$450.00
80,000 to 99,999 ---------------------- $300.00
60,000 to 79,999 ---------------------- $250.00
40,000 to 59,999 ---------------------- $200.00
20,000 to 39,999 ---------------------- $150.00
5,000 to 19,999 --------------------- $100.00
4,999 or less ----------------------- $50.00

Sewer Connection Fee (4” & smaller) ------ $1,050.00 (Ord 08-119)
(6” & smaller) ------ $1,500.00 (Ord 08-119)
(8” & smaller) ------ $2,000.00 (Ord 08-119)
Engineering Review (Grading and Drainage) ---------------- $200.00 (Ord 10-150)
Architectural Review (where applicable) ------------------ $200.00 (Ord 10-150)
Certificate of Occupancy -------------------------------------- $50.00
TN One Call (Lakeland Locate Fee) ----------------------------- $50.00
Monetary Deposit (refundable) ---------------------------- $750.00 (Ord. 10-150)

Commercial:
(New construction/exterior renovation)
$500,000 and up: $1,660.00 first $500,000 plus
$2.00 each additional $1,000 or fraction thereof
$100,000 to $500,000: $460.00 first $100,000 plus
$3.00 each additional $1,000 or fraction thereof, to and including $500,000
$50,000 to $100,000 $260.00 first $50,000 plus
$4.00 each additional $1000 or fraction thereof, to and including $100,000
Up to $50,000 $15.00 first $1000 plus
$5.00 each additional $1000 or fraction thereof, to and including $50,000

CITY OF LAKELAND FEE SCHEDULE

Sewer Connection Fee -------------------------------- (4” & smaller) ------ $1,050.00 (Ord 08-119)
(6” & smaller) ------ $1,500.00 (Ord 08-119)
(8” & smaller) ------ $2,000.00 (Ord 08-119)

TN One Call (Lakeland Locate Fee) $50.00
Certificate of Occupancy $50.00
Monetary Deposit (refundable) $1,500.00

ACCESSORY PERMITS:

Accessory Uses (deck, gazebo, shed (up to 300 sq. ft.) $ 50.00
Detached Garage $150.00
Pool House $150.00
Fences/Walls $ 30.00

Other:
Curb cut/driveway access inspection $ 50.00
Inspection of existing driveway/curb-cut $ 50.00
Ponds/Lakes $ 50.00
Model Home $500.00 each unit
Model Home (6 month permit extension) $300.00 each unit
Moving (building or structure) $100.00
Demolition (building or structure)
0 up to 10,000 cu. ft. $100.00
10,000 cu. ft. and over $100.00 plus
$10.00 per 1000 cu. ft.

SIGN PERMITS:

Wall mounted $100.00
Wall mounted annual renewal ------------------------ $ 25.00
Ground mounted ------------------------------------- $150.00
Ground mounted annual renewal ------------------------ $ 25.00
High rise (pole) ------------------------------------- $300.00
High rise (pole) annual renewal -------------------- $ 50.00
Temporary Permits ---------------------------------- $ 30.00

LAND DISTURBANCE PERMITS:

Residential:
Less than one (1) acre $ 200.00 (Ord. 10-150)
One (1) to five (5) acres $200.00 plus (Ord. 10-150)
$100.00 per acre or fraction

Over five (5) acres $1,500.00 plus
$150.00 per acre or fraction
Non-Residential:
Five (5) acres or less $1,500.00
Over five (5) acres $1,500.00 plus
$150.00 per acre or fraction


CITY OF LAKELAND FEE SCHEDULE

ROAD CUT PERMITS:

Road Cut $ 35.00 per cut/300 feet (Ord 09-131)
Road Bore $ 35.00 per cut/300 feet (Ord 09-131)

PERSONS FAILING TO ACQUIRE A STREET CUT PERMIT IN ACCORDANCE WITH SECTION 16.202 OF THE LAKELAND MUNICIPAL CODE SHALL BE CHARGED AN ADDITIONAL $50.00 PER PERMIT

TREE REMOVAL PERMIT:

Common Open Space: $30.00 per acre or fraction
(after development, Homeowners Assoc) up to $200.00 maximum

Builder/Owner/Occupied Residential Lots:  1 acre $30.00 plus $10.00 per tree
≥ 1 acre $30.00 per acre or fraction plus
$10.00 per tree up to $100.00 maximum
TREE DISTURBANCE PERMIT:
Trenching, transplanting, etc. $10.00 per tree


SUBMISSION FEES

Design Review Commission
Less than one (1) acre $200.00
One (1) – two (2) acres $300.00
More than 2 acres $400.00 plus $20.00 per acre
Application and review for sign/fence $100.00 per sign/fence
Appeal to DRC ------------------------------------- $200 (Ordinance 09-138)


Zoning Map Amendment Application: $500.00 plus $100.00 per acre
or fraction up to $5,000.00 maximum


Board of Zoning Appeals
Residential:
Variance $200.00
Special Use $200.00
Appeal $200.00

Non-residential:
Variance $300.00
Special Use $300.00
Appeal $200.00


CITY OF LAKELAND FEE SCHEDULE

Municipal Planning Commission

Non-residential:
Master or Preliminary Subdivision Plat $500.00 plus $10.00 per lot
Construction Plans $500.00 plus $50.00 per lot
Final Subdivision Plat $500.00 plus $10.00 per lot

Preliminary Site Plan
0 – five (5) acres $500.00
Six (6) – ten (10) acres $750.00
Over ten (10) acres $1,000.00
Construction Plans $500.00

Final Site Plan
0 – five (5) acres $500.00
Six (6) – ten (10) acres $750.00
Over ten (10) acres $1,000.00

Residential:
Master or Preliminary Subdivision Plat $ 500.00 plus $10.00 per lot
Construction Plans $500.00 plus $50.00 per lot
Final Subdivision Plat $500.00 plus $10.00 per lot

Planned Developments:
Preliminary Detailed Development Plan $1,000.00 plus $10.00 per lot
Secondary Detailed Development Plan $500.00 plus $10.00 per lot
Construction Plans $700.00 plus $50.00 per lot
Final Detailed Development Plan $1,000.00 plus $10.00 per lot
Amendment to approved PD Master Plan/Outline Plan $2,000.00
Appeal from DRC action/decision ------------- $200 (Ordinance 09-138)
Advertising Fee------------------------------- at cost (Ord. 09-136)
Re-notification $50.00 plus cost
Re-recording $50.00 plus cost


DEVELOPMENT FEES
(As associated with the Development Contract)
Inspection Fee: (Construction of Subdivision, minor or major) $500.00 plus $300.00 per lot

Administrative Review Fee: $200.00 1st lot / $100.00 (each additional lot) (Ord. 10-150)

Geographical Information System Fee: $200.00 1st lot / $50.00 (each additional lot) (Ord. 10-150)

Warning Siren Fee: ----------------------------------- $ 50.00 per lot



CITY OF LAKELAND FEE SCHEDULE

Road Improvements:
Canada Road between U.S. Highway 64 and I-40 $46.50 per lineal foot

¬Engineering Review Fee:
Exclusive of inspection fees $300.00 per lot

Natural Resources Inventory and Analysis Fee: $200.00 1st acre/ $25.00 (each additional acre) (Ord. 10-150)

Tree Removal: $100.00 per acre or fraction up to $10,000.00 maximum

Drainage Control Fees:
With Detention $ 500.00 per lot
Without Detention $1,000.00 per lot
Parkland Review/Development Fees:
Review:
Less than one (1) acre $200.00
One (1) – two (2) acres $300.00
More than two (2) acres $400.00
plus $20.00 per acre
Residential Development Fee:
Parkland Dedication Formula: D = L x A x P x M
D = Required parkland dedication in acres*
L = Number of lots/dwellings proposed
A = Average family size for the City (2.94)
P = Parkland ratio of .0100
M = Density multiplier from Table 2 (S/Dreg)

* Must comply with the City of Lakeland Zoning Ordinance

Parkland Improvement Fee $100.00 per lot

Street Lights Fee:
Not Developer installed 100% of cost

Sewer Development Fees: (Ordinance 08-119)

WATER METER SIZE (INSIDE DIA) DEVELOPMENT CHARGE
5/8 TO ¾ INCH $3,100
1 INCH $5,177
1 ½ INCH $13,653
2 INCH $16,523
3 INCH $47,847
4 INCH $82,000
6 INCH TBD
8 INCH TBD
10 INCH TBD

Sewer Lift Station Maintenance Fee $110,000/lift station (Ord 08-119)

0 comments: